How to order custom packaging from a factory in China

Minimum orders, samples, proofs, lead times, inspection and freight: the seven steps of ordering custom mailers and boxes from a China factory.

Noel, co-owner, on a bag making line at the Dream Packaging factory in Dongguan

Short answer: ordering custom packaging from a factory in China takes seven steps: write the spec, get a quote, test a sample, sign a printed proof, production, inspection, and freight. Factory listings for printed poly mailers commonly show production of about 10 to 25 days after you approve the proof, and minimum orders from a few thousand to 10,000 pieces per design. Most orders then travel by sea, so plan for the whole journey, not just the production time.

Buying direct from a factory gets you a lower unit price than a short-run printer, and full control of size, film and print. In return, you order more at a time and plan further ahead. This guide shows you what to expect at each step, and the mistakes that cost buyers time.

Factory or short-run printer?

Here is what suppliers publish about their own minimums and lead times. We have left prices out on purpose.

Supplier typePublished minimumPublished lead time
US short-run box printerFrom 1 box7 to 10 business days after proof approval
US custom poly mailer printer500 mailers; 25,000 for inline-printed runs4 to 6 weeks after written proof approval
China factory listings, printed poly mailersCommonly 5,000 to 10,000; some lowerAbout 10 to 25 days of production

Two things to note. Lead times usually start when you approve the proof in writing, not when you place the order. And they leave out shipping time. Short-run printers suit testing a design or a few hundred units. A factory suits the volume you reorder month after month.

Step 1: Write the spec

A clear spec gets you an accurate quote the first time. Send:

  • the product's length, width, height and weight, as you pack it,
  • the quantity, or two or three quantities to compare,
  • your artwork as a vector file (AI, EPS, SVG or PDF), and your brand colours as Pantone codes if you have them,
  • the finish you want, and photos or links of packaging you like,
  • where the goods are going.

No artwork yet? Our in-house team of 12 packaging designers sets up your design free, on the dieline of your box or mailer.

Step 2: Get the quote

Ask for unit prices at several quantities, so you can see where the price breaks. Ask for the production time in writing, and when the clock starts. Freight is quoted once your carton sizes and weights are fixed, because sea rates change from week to week.

Step 3: Test a sample

Put your real product in a real sample before anything is printed. We send a white sample to test the fit first. Stock sizes are quick to sample because the size already exists.

Step 4: Sign the printed proof

Approve colour on a physical proof, not a screen. This matters most on kraft, metallic and pearl films, where the base changes how every ink looks. Once you sign the proof, it becomes the standard the whole order is held to. Settle the artwork here: a change after the plates are made means new plates.

Step 5: Production

Production starts after your written approval. Check how the factory counts the time (calendar days or working days) and agree the finish date before the run begins.

Step 6: Inspection

Check the goods before they leave the factory, not after they land. Ask for photos and measurements from the bulk run, and compare them to your signed proof. In our print house, 16 inspection devices check the work between your artwork and the finished box.

Step 7: Freight

Packaging is bulky and low in value for its size, so most orders go by sea. One sourcing guide puts sea transit at about 20 to 35 days, and advises budgeting 10 to 14 weeks from brief to delivery for a first order. Air freight is faster but costs much more per kilo, so keep it for small, urgent orders. Import duty depends on your country and the product, so check with your customs broker.

Plan around Chinese New Year

Chinese New Year falls in late January or February. The official holiday is about a week, but factories slow down for one to two weeks before it and take one to two weeks after it to get back to full output. Many stop taking new orders four to eight weeks before the shutdown. If a reorder would land in that window, place it early.

Five mistakes that cost buyers time

  1. Approving colour on a screen instead of a physical proof.
  2. Changing the artwork after the plates are made.
  3. Not knowing when the lead time starts.
  4. Planning the production time but forgetting the freight time.
  5. Reordering too late before Chinese New Year.

Send your spec for a quote